Our Carrington Park project is a 20 tonne steel package which consists of a new building tying into an existing structure to create more squash courts for Knox City Council.
Our EG fuels project is a 20 tonne fuel station steel package which included the shop building and fuel canopy.
Our Cerberus Project is a 60t steel package which combines a new mechanics workshop & office building for Defence training at HMAS Cerberus
We successfully delivered a triple school package which contained 70 tonnes of structural steel spaced across 3 schools & 6 new buildings
We were engaged by Rodine Australia to supply and install 2 VDGS Gantry frames Airside at the Melbourne International Airport
Our Warehouses project consisted of 2 new 15 tonne sheds supplied and installed for a local commercial development client
We shop draw, fabricate, weld, deliver and install steel work as per your engineering and architectural plans. The Baldwin team are your partners in steel fabrication and installation.
We have various onsite welding set ups to cater for all your project needs and maintenance call outs.
Our 3t Maeda crawler is available for hire. Get in touch with us for pricing and lifting capacity. Very versatile machine with impressive lift capacity.
We bring your project to life with our shop drawing process that includes a 3D model of your structural steel. We can detail all connections and beams to suit your building requirements.
We offer heavy rigid transport services for any type of materials. Our truck can carry up to 7.4 metres and 14 tonne
Copyright © 2024 Baldwin Engineering - All Rights Reserved.
Powered by GoDaddy
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.